SERVING THE YOUNG
26.11.2010Special baptism service of January, 2nd
02.01.2011Now the left wing wall of the temple, part of the façade has been built up! All began with 600 slag-blocks that we bought for raising a new wall. Brothers from the church came to help unload the blocks. Pastor Valeriy came to bless them and help in their work. 600 slag- blocks unloaded in the future big hall 1 tone of cement bought and 5 cubic meters of sand
Pastor Dmytro, Deacon Slavic and 3 other home group leaders came together for a work bee on Saturday to haul up the slag-blocks on the balcony. A hard work but necessary. The view when the first block was laid. The wall growing up day after day. We hired a small brigade of three builders to construct the wall. Some metal welding work was necessary to strengthen the 4 meter high wall.
The builders worked despite the snowy weather. Almost finished – view from the inside. Three windows yet to be bought and installed. What it was like before . The wall has not been reconstructed since the purchase of the building in 2001 December 2010
9 YEARS HAVE PASSED , BUT THE TIME HAS COME. OUR CHURCH PRAYS FOR FINISHING THE RECONSTRUCTION OF THE TEMPLE BY SUMMER OF 2012 – THE TIME OF THE EUROPEAN SOCCER CHAMPIONSHIP TO BE HELD IN POLAND AND UKRAINE.