
SERVING THE YOUNG
26.11.2010
Special baptism service of January, 2nd
02.01.2011Now the left wing wall of the temple, part of the façade has been built up! All began with 600 slag-blocks that we bought for raising a new wall. Brothers from the church came to help unload the blocks. Pastor Valeriy came to bless them and help in their work. 600 slag- blocks unloaded in the future big hall 1 tone of cement bought and 5 cubic meters of sand
Pastor Dmytro, Deacon Slavic and 3 other home group leaders came together for a work bee on Saturday to haul up the slag-blocks on the balcony. A hard work but necessary. The view when the first block was laid. The wall growing up day after day. We hired a small brigade of three builders to construct the wall. Some metal welding work was necessary to strengthen the 4 meter high wall.
The builders worked despite the snowy weather. Almost finished – view from the inside. Three windows yet to be bought and installed. What it was like before . The wall has not been reconstructed since the purchase of the building in 2001 December 2010
9 YEARS HAVE PASSED , BUT THE TIME HAS COME. OUR CHURCH PRAYS FOR FINISHING THE RECONSTRUCTION OF THE TEMPLE BY SUMMER OF 2012 – THE TIME OF THE EUROPEAN SOCCER CHAMPIONSHIP TO BE HELD IN POLAND AND UKRAINE.